Your AE Post-Install Walkthrough — What We Cover, What's Yours, What to Expect at 30/90/365 Days
The day after we finish, what happens? Here's our written warranty, the walkthrough we do at handoff, and the touch-points at 30, 90, and 365 days.

Handoff day
Project manager walks every surface, every fixture, every piece of equipment with you. We test every light, every valve, every burner. You sign off on a digital punch list — anything not perfect goes on the list and we stay until it's clear.
Your warranty binder
- Structural pool warranty — lifetime on shell.
- Pool interior finish — manufacturer term (typically 10–15 years on pebble).
- Equipment — manufacturer terms (Pentair/Jandy/Hayward 2–3 yrs, longer on premium).
- Pavers — lifetime structural; install workmanship 5 yrs.
- Outdoor kitchen — appliance manufacturer + 2 yr install workmanship.
- Glass fencing — 10 yr structural, lifetime on tempering.
- Lighting — fixture manufacturer + 5 yr install workmanship.
- Plants — 1 yr live replacement.
30-day check-in
Service tech returns to balance pool chemistry, tighten any hardware that has settled, re-tension any low-voltage lighting connections, and answer everything you've thought of in the first month.
90-day visit
Polymeric sand top-off if needed (some settling is normal in the first season). Sealer touch-up on travertine. Equipment firmware updates. Full system pressure test.
Annual visit
Year one (and every year after for active service clients): full inspection, chemistry reset, equipment service, light fixture refresh, and a written report. This is how we keep AE projects looking like AE projects 10 years later.


