Published Standards

The standards we refuse to compromise on.

Most Arizona backyard builders won't publish their construction standards — because they'd rather adjust them job-to-job depending on the bid. We publish ours so any homeowner can hold us to them, line by line.

If a competing builder won't match a standard on this page, that's useful information. Use it.

9 categories·39 standards·8 things we won't do·AZ ROC 340966 R-62 · 341002 R-3 · 347738 KA-5 · 211530 CR-21
Pools & Spas

How we build a pool

Pools fail in Arizona for a small list of reasons. We engineer against every one of them in the design stage, not the warranty stage.

  • 01

    Pebble interior finish standard (Pebble Tec, Pebble Sheen, or equivalent) — never plain plaster.

    Why: Plain plaster stains and degrades in AZ water inside 5–7 years. Pebble runs 10+.

  • 02

    Variable-speed pumps only — Pentair, Jandy, or Hayward tier.

    Why: Required by AZ code on new builds. Single-speed pumps cost more in electricity within a year.

  • 03

    Automation-ready equipment pad on every build.

    Why: App control, scene lighting, and remote diagnostics are part of modern ownership — not a $5k afterthought.

  • 04

    Auto-fill plumbed into every pool.

    Why: Summer evaporation in AZ runs an inch per day. Manual top-off is a daily chore we won't ask owners to do.

  • 05

    Glass tile, porcelain, or stone waterline tile — not budget ceramic.

    Why: Calcium scaling shows fastest on cheap glaze; premium tile holds up to AZ hard water.

  • 06

    ROC-compliant 15/25/25/25/remainder draw schedule.

    Why: Aligns payments with completed phases. Front-loaded draws transfer risk to the homeowner.

Pavers & Hardscape

How we install hardscape

Pavers don't fail in Arizona because of bad stone — they fail because of bad base prep. Our specs aren't optional.

  • 01

    ABC (Aggregate Base Course) only — 2–3" compacted on patios and walkways, 4–6" on driveways, with additional depth where build-up or higher-traffic use calls for it. Followed by a 1" screeded sand bed and polymeric joint sand on every install.

    Why: Depth matches the load. ABC's graded mix locks together and sheds water. Quarter minus traps water and pumps fines up through the joints, so we never use it under pavers (it belongs under artificial turf). The base spec is the single biggest paver-longevity variable.

  • 02

    Polymeric sand joints — installed, watered, and cured per manufacturer spec.

    Why: Stops weed growth, stabilizes paver edges, prevents joint sand wash-out in monsoon.

  • 03

    Edge restraint on every perimeter cut.

    Why: Without it, pavers walk outward over time and the whole field loosens.

  • 04

    Travertine, porcelain, or premium concrete pavers — never spray-on coatings.

    Why: Spray-on deck coatings peel and chalk in AZ sun. We don't quote them, ever.

  • 05

    Drainage planned before pavers are cut.

    Why: Backyard slabs that hold water destroy doorframes, slabs, and pool decks. We grade first, finish second.

Pergolas & Shade

How we build shade

Engineered shade structures in Arizona have to survive 115° heat, 60+ mph monsoon gusts, and decades of UV. The shortcuts that get taken here are the ones that hurt owners.

  • 01

    Engineered, stamped plans on every pergola over code threshold.

    Why: Required by AZ jurisdictions and protects the homeowner at resale and insurance.

  • 02

    Aluminum or steel-reinforced wood for long-span structures.

    Why: Plain wood pergolas sag and split in AZ sun. We design the lifespan into the material.

  • 03

    Concealed electrical & gas runs at design stage.

    Why: Surface-mounted conduit after the fact looks like an afterthought. Plan it before the slab pours.

  • 04

    Powder-coat or commercial-grade exterior finish on metal.

    Why: Hardware-store paint chalks within 18 months in AZ. Powder coat lasts a decade-plus.

Turf & Landscape

How we install turf

Cheap turf is cheap for a reason. We won't put product on a job that we wouldn't put in our own backyards.

  • 01

    Premium turf only — minimum face weight, UV-rated for Sonoran sun.

    Why: Bargain turf pancakes and fades inside 18 months in AZ heat.

  • 02

    Cool-fill (Envirofill, T°Cool, or equivalent) — never silica sand.

    Why: Silica radiates heat and traps odor. Cool-fill keeps the surface usable in summer.

  • 03

    Dog-rated drainage build-up where applicable.

    Why: Odor control for pet zones; standard infill won't drain pet waste cleanly.

  • 04

    Compacted aggregate base, not bare dirt.

    Why: Without base, the turf settles, dips, and shows seams within a year.

Kitchens, Gas & Fire

How we run gas & fire

Outdoor kitchens and fire features are not weekend projects. We engineer gas, electrical, and water in the design phase — before any concrete is poured.

  • 01

    Licensed gas and electrical runs, permitted and inspected.

    Why: Outdoor kitchens that skip permits become disclosure problems at resale.

  • 02

    Stainless steel appliances — commercial-grade hardware only.

    Why: AZ heat eats consumer-tier outdoor appliances in 2–3 seasons.

  • 03

    Sealed stone, concrete, or stucco enclosures — no untreated wood structure.

    Why: Wood under outdoor kitchens warps, rots, and harbors pests in AZ humidity swings.

  • 04

    Auto-ignition on fire features with safety shutoff.

    Why: Match-light gas features fail safety code in most AZ jurisdictions.

Lighting & Glass

How AE LEDs & Sonoran Glass & Fence work

Our in-house lighting and glass divisions install only what they would install on their own homes. No reselling, no white-labeling.

  • 01

    RGBW permanent lighting with programmable scenes — not single-color string lights.

    Why: Owners change their use of a backyard across the year; the lighting should change with them.

  • 02

    Frameless and semi-frameless glass engineered to AZ pool-barrier code.

    Why: Pool barriers have strict height, gap, and latching rules. Off-spec glass fails inspection.

  • 03

    Hardware rated for AZ sun and monsoon wind load.

    Why: Consumer-grade hinges and latches corrode and loosen in AZ within 2–3 years.

  • 04

    Lighting controls and warranty handled by AE — not a subcontracted installer.

    Why: Aftercare is part of the build. We pick up the phone when a scene needs reprogramming.

Permits, HOA & Code

How we handle approvals

Permits and HOA approvals aren't optional polish — they're the difference between a backyard that holds up at resale and one that becomes a disclosure problem.

  • 01

    When permitting is in AE's written scope, AE prepares and submits applications in AE's name — not the homeowner's. Approval remains subject to the governing authority.

    Why: If a builder asks you to pull the permit yourself, the builder is dodging accountability. We don't.

  • 02

    Engineering stamps on every structure that requires them.

    Why: Pergolas, retaining walls, raised spas, and pool barriers require engineering in AZ jurisdictions.

  • 03

    HOA architectural submittal handled by AE, with the homeowner copied on every email.

    Why: HOA processes are slow and political. We've done hundreds — homeowners have done one.

  • 04

    Inspections scheduled at the right phase, not at the end.

    Why: Skipped inspections become rip-and-redo work at resale.

Communication

How we communicate during a build

Most homeowner complaints aren't about quality — they're about silence. We answer the silence problem at the contract stage.

  • 01

    One project manager, one phone number, named in the contract.

    Why: You shouldn't have to figure out which trade is on site or who to call when something changes.

  • 02

    Scheduled written updates at every phase transition.

    Why: Phase transitions are where surprises happen. Written updates create a paper trail.

  • 03

    Change orders in writing before the work — never verbal, never after.

    Why: Verbal change orders are the #1 source of end-of-job disputes in residential construction.

  • 04

    All major decisions documented in the project file.

    Why: Material picks, color choices, equipment selections — captured so nobody is guessing at install.

Pricing & Payment

How we price and collect

Two published payment schedules — one for pools (ROC-compliant), one for everything else. No surprise draws. No front-loaded contracts.

  • 01

    Real ranges published on every service page. No 'call for pricing'.

    Why: Hiding price wastes the homeowner's time and screens for the wrong customers.

  • 02

    Pool draws: 15% down / 25% dig / 25% plumbing / 25% decking / remainder at finish.

    Why: AZ ROC-aligned. Anything front-loaded transfers risk away from the builder.

  • 03

    Non-pool work: 50% deposit, 35% at project start or materials delivery, 15% due at completion.

    Why: Keeps the builder financially motivated to finish — and finish right.

  • 04

    Material allowances itemized by brand and per-unit cost.

    Why: Lets homeowners choose upgrades knowingly, not at a surprise change-order.

What we won't do

Sometimes the standard is saying no.

Saying no to the wrong material, the wrong shortcut, or the wrong job is part of how AE protects its work and its name. Here's what we won't quote, won't install, and won't sign onto — even if a homeowner asks.

Spray-on pool deck coatings

They peel, chalk, and fail in AZ sun. We've replaced too many.

Single-speed pool pumps

Outlawed on new AZ builds. Even where they're legal, they're wasteful.

Bargain-grade turf or silica infill

Heat-baked, smelly, and replaced within 2 years. Not worth installing.

Unpermitted gas or electrical runs

Saves a week and creates a decade of disclosure risk.

Verbal change orders

Every change is documented and signed before the work starts.

Front-loaded payment schedules

We collect on completed phases — not on signatures.

'Call for pricing' game

We publish ranges so homeowners can budget without a sales pitch.

Subcontracted aftercare

If we built it, we service it. Aftercare doesn't get handed to a stranger.

Hold Us To It

Print this page, bring it to your design call.

Use these standards as a checklist with any builder you're evaluating — including us. The builders worth hiring will be glad you brought it.