Bidding 101

How to read a pool & outdoor-living bid.

We wrote this so you can buy from anyone — not just us. Start by deciding how many contractor bids should you get? If you have three bids in front of you and one is far cheaper, the gap may be explained by the line items below — sometimes scope that is missing, sometimes legitimate differences in materials, access, scheduling, warranty or risk. Verify it line by line and ask, in writing, why the lines differ.

Read every line

'Included' alone does not identify the specification. Ask the builder to spell it out.

Watch the unit

Square feet, linear feet, BTU, PSI, gallons. Numbers cap risk; adjectives don't.

Compare warranty terms

Structure, surface, equipment, and labor can be four different timelines. Ask for all four in writing.

01 · Shell & structure

The pool you can't see after gunite day.

Line itemWhat it actually isWhat a vague bid saysWhat to ask for in writing
Gunite / shotcrete strengthCompressive strength of the pool shellNot listed at allThe design strength stated in writing, matching the engineered plans for your pool, with the testing the plans call for
Rebar gridSteel cage that holds the shell together'Steel included'Bar size and spacing stated, matching the approved engineered drawings for your project
Bond beamReinforced beam at the top of the pool wallNot specifiedDimensions and reinforcement stated, matching the approved engineered drawings
Plumbing diameterSuction and return line size'Plumbing included'Line sizes stated per run, sized to the equipment and flow rates in the plan
SkimmersSurface cleaning intake count'Skimmer included'Count and placement stated, sized to your surface area and plan
02 · Equipment

What's actually behind the equipment-pad fence.

Line itemWhat it actually isWhat a vague bid saysWhat to ask for in writing
PumpBrand + variable speedSingle-speed or 'builder grade'Pentair IntelliFlo3 VSF or Jandy ePump VS — by model number
FilterType + media capacityCartridge, no size listedDE or large cartridge (~520 sq ft) sized to the pump flow rate
HeaterBTU + fuel type'Heater included'Pentair MasterTemp 400K BTU (gas) or 140K (electric), brand named
AutomationSmart control + appMechanical timerPentair IntelliCenter or Jandy iAquaLink, with a per-device list
SanitizationChlorine systemChlorine tabs / floaterSalt cell (Pentair iChlor / Jandy TruClear) sized to pool gallons
03 · Finishes

What the family will touch every day.

Line itemWhat it actually isWhat a vague bid saysWhat to ask for in writing
InteriorPlaster / pebble / quartz finish'White plaster'Named product (Pebble Tec, Pebble Sheen, Wet Edge, NPT) with color
Waterline tileLinear feet + product'Tile included'Quantity in linear feet + tile SKU + grout color
CopingMaterial + edge style'Travertine coping'Stone type + thickness + edge profile (bullnose, eased, drop-face)
DeckMaterial + square footage'Concrete decking'Sq ft, finish (broom, salt, acid wash, pavers), expansion-joint layout
04 · Contract & terms

The contract terms worth reading closely.

Line itemWhat it actually isWhat a vague bid saysWhat to ask for in writing
Payment scheduleDeposit and progress payments tied to construction stages'Deposit due at signing', no stages namedDeposit, progress payments and the stages each is tied to, written out. Qualifying owner-occupied residential in-ground pool and spa contracts follow the stage caps in A.R.S. §32-1158.01; AE's own practice is 15 / 25 / 25 / 25 / 10
Change ordersPricing method + approval process'Time and materials', no rate or approval step statedWritten pricing method, how markup compares to the base contract, and written approval before work continues
Permits & engineeringWho applies, who pays, when'Permits as required'Named party applies, cost itemized, engineered documents delivered before the dig
ScheduleStart / substantial-completion targetNo datesCalendar start, milestone dates, weather-delay policy in writing
WarrantyStructure / surface / equipment / labor'1 year', no scope or exclusions statedEach of the four terms stated separately in writing, with exclusions and transferability, and manufacturer terms passed through
Sources

Official sources and limits

Reviewed September 14, 2026. Current official records and current law control. Structural, plumbing and equipment details for any specific pool are set by the approved engineered plans, the signed scope, manufacturer instructions and the authority having jurisdiction. General educational information only — not legal, engineering, code, insurance or contract advice.

Want help reading a specific bid?

Send it over — we'll mark it up free.

Email the PDF to support@aeoutdoorliving.com and we'll redline it against the checklist above. We'll tell you honestly whether it's a fair number for the scope — even when the answer is "take that bid."