Skip to main content
Arizona licensed, bonded & insuredServing Arizona homeowners since 2005Peoria design showroomWritten, itemized project scopesProject-specific payment & warranty terms
Boulder Fire Feature concept render by AE Outdoor Living
Fire Library
AEOutdoor Living

Illustrated planning concept · Final design follows field verification and approved project documents

Fire Library · Naturalistic / Southwest

Boulder Fire Feature

Natural boulder carved with a gas burner cavity.

Size range
36"-72" boulder, single or cluster (planning range)
Installed investment range
$5,200 – $14,500 each
Best for
Desert-naturalistic landscapes, accent fire elements

(623) 300-2589

Two pages: concept rendering, planning dimensions, option decisions, and verification checklist. No email required.

Start with this concept

An illustrated starting point

This concept is not a permit, engineering, fabrication, appliance-cutout, code-approval, or construction drawing. Field measurements, selected manufacturer documents and listings, site and utility conditions, required qualified engineering, AHJ/HOA review, approved documents, and the signed scope control the final design. The installed investment range is for planning, not a quote.

About this design

Hand-carved cavity in a natural Arizona boulder housing a listed gas burner. It reads as landscape by day and glows at night. Because the stone is set once, fuel, drainage and service access are planned before it arrives.

Key features

  • · Hand-carved natural Arizona boulder
  • · Listed gas burner selected for the approved project
  • · Fire glass or lava-style media allowed by the selected appliance
  • · Cavity drainage planned into the setting detail
  • · Single or cluster arrangement

Equipment & systems

  • · Listed gas burner from a current selection family, sized in the approved design
  • · Listed valve and ignition selected with the appliance
  • · Remote or switch control
  • · Drain path from the cavity, detailed in the approved design
AE Fire Feature Planning Board

How this fire feature is planned

Boulder feature

A natural boulder is carved to receive a listed gas burner in a recessed cavity, set on prepared support with fuel, drainage and service access reserved beneath it, and placed as a single element or a small cluster in the landscape.

Visual and form character

Reads as landscape by day and as a glow by night. Because the stone itself is the feature, selection — color, face, and how it sits in grade — is the design decision.

Flame and use experience

A quiet accent flame rather than a gathering fire. It works as a night-time landscape element seen from a distance or passed on a path.

Fuel and controls planning

Fuel routing to a set stone, the control method and an accessible shutoff are planned before the boulder is placed, because reaching them afterwards is difficult by design.

Care and service

Dust and debris collect in an open cavity, and the burner and drainage beneath it must stay reachable once several thousand pounds of stone sits on top.

Zones this concept reserves

  1. A
    Carved cavity

    The recess holding the listed burner and its media, sized in the approved design

  2. B
    Boulder body

    The stone itself — its face, orientation and how it sits in the landscape

  3. C
    Support and setting bed

    Prepared support beneath the stone and how it meets grade

  4. D
    Fuel, drainage and service

    Reserved routing, drainage from the cavity and accessible shutoff and service

  5. E
    Placement and access route

    Landscape placement and the equipment route needed to set the stone

Finish and material zones

Stone selection
Color, face character and orientation; every boulder is unique, so selection is part of the design.
Cavity interior
How the recess is finished around the burner and the media it holds.
Grade and base treatment
Gravel, planting or paving where the stone meets the ground.
Cluster arrangement
If more than one element is used, how the group is composed and lit.

Lock these before fabrication and ordering

  • Single element or a cluster, and how the group is composed
  • Boulder selection — color, character and concept size range, confirmed on site
  • Placement in the landscape and its relationship to paths and seating
  • Control method and where the accessible shutoff sits
  • Media appearance from the options the selected appliance allows
  • Base and planting treatment where the stone meets grade

Verified before anything is built

  • Boulder selection, actual weight, delivery route and the equipment required to place it — confirmed for the specific stone and site
  • Support, setting and any required engineering for the approved placement detail
  • The selected current manufacturer instructions and listing for every burner, insert, valve, ignition and control — obtained and reviewed before fabrication or ordering
  • Fuel type, routing, sizing, pressure, shutoff location and total connected load — determined by the qualified gas trade for this address and this scope
  • Cavity drainage and reachable service and shutoff access before the stone is set
  • Current AHJ and HOA requirements for this address and this scope — confirmed in writing before construction

Living with it — care and seasonal notes

  • Clear the cavity of blown dust and debris; an open recess collects more than an enclosed body.
  • Confirm cavity drainage stays clear after rain so water does not sit around components.
  • Keep the burner, valve and shutoff reachable — service access under a set stone must be designed in, not improvised.

Planning this feature in Arizona

  • Monsoon rain fills an open cavity, so the drainage path is planned with the setting detail.
  • Sun exposure makes natural stone extremely hot to the touch through the afternoon and into the evening.
  • Desert dust settles into the recess quickly; cleaning access matters more than concealment.

This planning board is a concept-stage tool. It is not permit, engineering, fuel or gas, electrical, structural, venting, manufacturer-installation, code-approval, safety-inspection, or construction documentation, and nothing here is an installation instruction. Selected current manufacturer instructions and listings, qualified gas, electrical and structural trades as applicable, measured site conditions, total connected load, current AHJ and HOA requirements, approved documents, and the signed scope control the final build. Never leave a burning fire feature unattended, and keep children and pets supervised around it.

Get a Ballpark Estimate
Related guides

Keep learning before you build.