Three pieces, meant to be read in order. Part one is this page.

  1. Why one plan comes before any bid — you are here.
  2. What a complete outdoor design actually includes — the difference between a rendering and a buildable plan.
  3. How to compare bids once everyone has the same plan — reading two proposals line by line.

The Plan-First checklist

Everything on this page, condensed to a two-page printable list — what to settle before you call anyone, what a complete plan has to cover, and what to read line by line in every bid.

Download the checklist (PDF)

Bid comparison worksheet

A one-page, print-and-fill template with a column for each bidder — license and insurance, what scope is carried or excluded, how materials and allowances are specified, payment schedule, warranty and exclusions — so you can compare proposals apples-to-apples instead of comparing bottom-line numbers.

Download the worksheet (PDF)
Budget & Planning · Education

Get the plan first. Then get the bids.

An outdoor project is a significant investment, and one of the decisions that shapes it happens before any shovel moves: many homeowners start collecting bids before they own a plan. Five companies come out, five people sketch something different on an iPad, and five prices arrive that are difficult to compare to each other. This page explains why that process is hard to navigate, what it can cost you in time and dollars, and what to do instead. It is not a pitch for hiring us — you can take a plan you own to any contractor in the Valley.

The honest version: Bidding a project that has never actually been designed is a common source of confusion, change orders and friction between homeowners and contractors. A plan is not paperwork. It is what lets two prices describe the same project.
  • AZ ROC 211530 · 347738 · 341002 · 340966
  • Arizona-built since 2005
  • President, Southwest Hardscapes Association
01

What actually happens when you collect ten bids

  • Every company designs to its own strengths. The pool builder centers the pool. The landscaper centers the turf. The hardscape crew centers the patio. None of them are wrong — they are each solving a different problem.
  • You end up comparing layouts, not prices. You liked the pool placement on bid three and the kitchen on bid six, and neither company priced the other's idea.
  • Scope drifts silently. One proposal includes demolition and haul-off, another assumes you handle it. One carries drainage, another does not mention where water goes.
  • Allowances hide the gap. Two proposals can show the same paver line and still be far apart in budget once one carries a real selection and the other carries a placeholder.
  • A lower number can simply cover less work. That is not necessarily dishonesty — it is often a smaller scope, and nobody drew a line showing you what was missing. Ask in writing which items are excluded.
  • By bid seven you are exhausted, the season has moved, material pricing has moved, and you are no closer to a decision than you were in week one.
02

Why nothing is ever apples to apples without a shared plan

  • Elevations. Where finished grade sits controls step counts, retaining, deck heights and how much fill or export the job needs. Two bidders guessing at elevations are pricing two different jobs.
  • Drainage. Where water goes is a design decision with real cost. It is also frequently left vague on a fast bid, so ask each bidder to put the plan and the destination in writing.
  • Underground. Gas runs, electrical, low-voltage, irrigation sleeves and pool plumbing all get cheap when they are planned and expensive when they are added after concrete.
  • Structures. A shade structure's footings, attachment and any required review depend on where it lands and how big it is. That is a plan question, not a line-item question.
  • Materials. “Pavers” is not a specification. Manufacturer, series, size, pattern, color and joint treatment change both the look and the number.
  • Sequence. A project built in the wrong order pays twice — new turf torn out for a trench, a finished patio cut for a gas line.

Want a number for your own property?

Tell us the space and we'll come back with a real range for your site — no pressure, no "call for pricing."

03

What the bidding merry-go-round actually costs you

  • Weeks. Repeated site visits and follow-ups, and a decision that can slide a full season — sometimes into different pricing and a longer schedule.
  • Clarity. After enough conflicting designs, it gets harder to picture your own yard. Decision fatigue is real, and it can end in either paralysis or an impulse signature.
  • Money at the back end. Anything not drawn tends to become a change order, and change-order pricing during construction is negotiated with one company rather than compared across several.
  • Goodwill. Contractors who have designed and priced a project three times for a homeowner who is still shopping tend to get slower, thinner and less interested — right when you need them engaged.
  • The relationship you will live with. You are not buying a product; you are entering a construction project with a company for weeks or months. Starting that on a foggy scope is how good jobs go sideways.
04

Plan first: how the process should actually run

  • Step 1 — Define how you will use the space. Who is out there, when, doing what, and what has to be finished first. This is the part that no contractor can guess for you.
  • Step 2 — Set an honest investment range and say it out loud. A designer who knows the range designs something buildable; a designer working blind draws something you will have to cut.
  • Step 3 — Buy one complete plan and scope. Layout, dimensions, elevations, drainage direction, feature list with sizes, material selections, utility needs and phasing.
  • Step 4 — Confirm you own it. Get ownership, revisions and reuse rights in the design agreement in writing.
  • Step 5 — Bid that exact plan to two or three qualified licensed contractors, with the same written scope document going to each one.
  • Step 6 — Compare line by line, ask every bidder the same clarifying questions, and choose on scope, standards, schedule, warranty and fit — not on the bottom number alone.
05

What one shared plan buys you that a stack of sketches does not

  • One layout you have actually decided on, instead of six half-liked ones.
  • A scope document that makes a low bid visibly low instead of mysteriously low.
  • Leverage. You can hold every bidder to the same drawing, and you can re-price a specific change with all of them at once.
  • Phasing that works. If the whole thing is not in the budget this year, the plan tells you what has to be roughed in now so phase two does not tear up phase one.
  • Portability. A plan you own can be built by whoever you choose, this year or in three years.
  • A shorter, calmer construction period, because the decisions were made when they were still cheap to make.
06

Fair questions people ask us about this

  • “Isn't this just a way to charge me for design?” It is a way to charge for design, yes — openly, instead of burying it inside a construction number. You get a deliverable you own either way.
  • “What if I don't like the plan?” That is what the revision rounds in the design agreement are for. Read that section before you sign it, with any designer.
  • “Can a plan be too detailed?” It can be over-engineered for a small scope. A patio refresh does not need what a full pool-and-structure build needs. Match the depth of the plan to the size of the project.
  • “Do I still need bids if I trust one company?” Not necessarily. Plenty of homeowners design and build with one team on purpose. The plan matters either way — it is what your contract points at.
  • “Will AE bid someone else's plan?” We will review it and tell you honestly whether it is buildable as drawn on your property, and what we would need clarified before pricing it.
07

The short version

  • One plan. Two or three bids. One written scope everyone prices.
  • Decide the layout before you shop the price.
  • Own the plan, in writing.
  • Compare scope first and price second.
  • Make the hard calls on paper, where changes are free.
FAQ

Common questions.

You can, and many people do. Complimentary concepts vary and may reflect that company’s crews, material lines, and typical scope. Ten designs can mean ten different layouts, material lists and assumptions about drainage, elevations, electrical and demolition, and different sets of exclusions. When little lines up, the bottom number becomes the only thing left to compare, and on its own it tells you very little. Ask each company what its concept includes, who owns the documents, and whether the same scope can be issued to other bidders.

Two or three, from qualified licensed contractors, all bidding the same complete plan and the same written scope. That gives you a real read on price and on how each company thinks. Beyond three, you are usually not gathering information anymore — you are collecting variations and delaying the project while material and labor pricing moves.

It is an investment in the part of the project that controls everything else. A plan you own sets the layout, elevations, drainage direction, material list, feature sizes and phasing before anyone breaks ground. Moving a wall or a pool on paper avoids the cost and disruption of moving it after a crew has poured it, and a plan you own can be bid by anyone you want — you are not locked into the company that drew it.

Ask that question in writing before you pay anyone, including us. Ownership, usage rights, revisions included, and what happens if you build with a different contractor should all be spelled out in the design agreement. A plan you cannot take with you is not really a plan you bought.

Design deliverables vary widely, so ask what is included. Some companies recover design time inside the construction price; others provide a concept intended to start a conversation. Neither is wrong on its own — understand which one you are getting, how detailed it is, who owns and may use the documents, and whether it carries the elevations, drainage, structural detail and utility routing a build needs.

The layout and dimensions, the finished elevations and how water leaves the property, the feature list with sizes, the material selections or at least their allowance level, the electrical and gas needs, the structures and their footings, what is being demolished, and how the project is phased if it is not being built at once. That set is what makes two bids comparable.

No, and it should not. Companies carry different overhead, crews, warranty terms, schedules and quality standards, and those differences belong in the price. A shared plan does not flatten the bids — it makes the differences visible so you can decide what you are actually paying more or less for.

Then the plan did its job before construction started. With one plan in hand you can cut or phase specific scope — hold a structure for phase two, change a material, shrink a patio — and re-price that exact change with everyone. Without a plan, budget decisions tend to happen mid-project, when fewer options are still open.

Yes. That is the point of owning it. We would like to build it, and we will tell you honestly whether we are the right company for the scope. If you take the plan elsewhere, you take with you the layout, dimensions and scope that let you hold that contractor to something specific.

Stop adding to the pile. Pick the layout you actually want to live in, get one plan and scope built from it, then re-price that plan with two or three of the companies you liked. You will have spent a little more time and gotten your first true apples-to-apples comparison.
Next step

From planning to estimating

Once you know what belongs in the plan, put rough numbers next to it. Start with the calculator for a whole-project range, then read the guide for each piece of scope you are carrying. These are planning ranges for budgeting, not quotes — measured conditions, selections and the signed scope control the final investment.

Open the outdoor renovation cost calculator

Pricing guides by scope

Ready to talk to AE about your project?

Have AE build the plan your project gets bid from

AE designs the full outdoor envelope — layout, elevations, drainage direction, materials, utilities and phasing — as one plan you own. Build it with us or take it to another licensed contractor; either way you finally have one document that every bidder is pricing.

What to bring to the first conversation
  • Photos of the space today, including where water sits after a storm
  • A rough site sketch or your plat with dimensions if you have one
  • How you actually use the yard — and who else is out there
  • The investment range you are working inside
  • Any bids or sketches you have already collected
  • What has to be usable first if the project gets phased
What happens after you reach out

We reply within 1 business day

A real AE team member — not an auto-reply — reads your submission and responds by phone or email, usually same day during business hours.

Quick mutual-fit review

We confirm project type, location, rough budget range, and whether AE's process is the right fit before scheduling any site time.

Scope conversation before pricing

We understand the project first — no rushed generic quote. You get honest guidance on repair vs. rebuild, phasing, and what your investment range actually looks like.

You decide the next step

If it's a fit, we move into design, selections, and preconstruction. If it isn't, we tell you — and often point you toward the right resource anyway.

Two ways to start — pick whichever feels right

The intake form takes about 3 minutes and routes straight to the AE team. Prefer to talk first? Call the number below during business hours.

Start a Design Conversation
(623) 300-2589 support@aeoutdoorliving.comExisting client? Use the Client Care path for warranty or aftercare.

Start with a plan you own

Tell us how you use the space, what has to happen first and the range you are working inside. We will walk you through what a complete plan for your property would need to cover — and you can take it to whoever you want to build it.

Talk About a Project Plan
Your home investment — protected

Why this is an investment, not a cost.

An AE backyard is engineered to add daily livability and long-term home value. We publish honest ranges and build to code with a licensed and bonded Arizona crew. AE provides project-specific workmanship and manufacturer-warranty information in the signed agreement. Website summaries are for planning only.

  • Licensed, bonded & insured in Arizona. ROC 340966 (R-62) · ROC 341002 (R-3) · ROC 347738 (KA-5) · ROC 211530 (CR-21). Most Arizona contracting work valued at $1,000 or more — or requiring a permit — must be performed by a properly licensed contractor, subject to statutory exemptions. Verify the legal entity, license status, and classification with the Arizona Registrar of Contractors.
  • Real ranges, itemized scope. You see materials, finishes, equipment models, and a line-item budget before you sign — not a one-line "pool — $90,000."