Skip to main content
Arizona licensed, bonded & insuredServing Arizona homeowners since 2005Peoria design showroomWritten, itemized project scopesProject-specific payment & warranty terms
Hiring & vetting

A warranty is only as good as the company standing behind it.

Every proposal you collect will have a warranty line on it. Most of them will sound similar, and a few will sound generous. The number of years is the least useful part of that sentence. What decides whether the warranty ever helps you is whether the company writing it is still licensed, still staffed, and still answering the phone the day something moves, leaks, settles, or stops working.

The honest version: We are not the cheapest bid on most jobs, and we are not going to pretend a long warranty number is a substitute for a company that can honor it. A warranty is a promise to send a crew back at our expense. That promise is only worth what the company behind it is worth — so verify us the same way you verify everyone else. Look up the license. Read the issue date. Ask who built the photos. We would rather you check.
  • AZ ROC 211530 · 347738 · 341002 · 340966
  • Arizona-built since 2005
  • President, Southwest Hardscapes Association
01

Why the paper matters less than the company

A workmanship warranty obligates a contractor to return and correct their own installation at their own cost. Nothing about that document repairs anything by itself. It requires a licensed entity that still exists, still has crews and equipment, still carries insurance, and still has a service process. Manufacturer coverage is a separate thing: it follows the product, it usually requires a qualified installer to diagnose and file, and it commonly excludes damage caused by improper installation — which is precisely the failure most homeowners are worried about.

02

The five documents to ask for before you sign

  • The Arizona ROC license number and the legal entity name it is issued to — then verify both on the ROC's own site, not on the contractor's website.
  • The license issue date and the classifications held. Classification matters: a license for one trade does not authorize another.
  • A current certificate of general liability insurance, issued by the insurer, listing the same legal entity.
  • Proof of workers' compensation coverage for everyone who will physically be on your property, including subcontracted crews.
  • The written warranty itself — not a bullet in a sales sheet, the actual terms.

Applying this to a pool project? See the Arizona pool installation guide for permits, phases, and what drives the schedule.

Applying it to a glass barrier? See what a glass pool fence costs in Arizona, including the footing work that gets quoted separately.

Want a number for your own property?

Tell us the space and we'll come back with a real range for your site — no pressure, no "call for pricing."

03

How to read the license record

  • Issue date — how long this specific entity has been licensed, which is not the same as how long the owner says they have been 'in the business.'
  • Status — active, suspended, cancelled, or expired. Only active counts.
  • Qualifying party — the licensed individual whose experience the license rests on. If that person recently changed, the operating history behind the license changed too.
  • Classifications — the scopes of work this license authorizes. Pool, hardscape, landscape, electrical and structural work can require different ones.
  • Bond and complaint history — filings, resolutions, and disciplinary actions are part of the public record.
  • Arizona's handyman exemption applies only to work under $1,000 total — labor and materials combined for the whole project — and never when a building permit is required. It is a lifetime threshold for that scope, not a per-visit allowance.
04

When the portfolio is older than the license

This is the situation worth slowing down for. A company shows three years of finished patios, pools, or glass fencing, and the license was issued eight months ago. That gap has legitimate explanations and illegitimate ones, and you are entitled to know which applies before you hand over a deposit.

05

Ask these four questions — and listen to how fast the answers come

  • Which of the projects on your website did this licensed entity build, and in what year? A straight answer is immediate.
  • Who is the qualifying party, and where did they hold their prior experience — as an owner of a previous licensed entity, or as an employee of one?
  • Can I speak with two homeowners from projects completed in the last twelve months under this license?
  • Is there a job running this week I can drive past?
06

Legitimate explanations for a short license and a long portfolio

  • The owner spent years as a foreman or project manager for another licensed contractor and is now licensed in their own name.
  • The business reorganized — a new LLC, a partnership change, or a name change — and the prior licensed entity is verifiable in the same public record.
  • The company expanded into a new classification, so a second, newer license sits alongside an older one.
07

Answers that should stop the conversation

  • The photos cannot be tied to an address, a month, or a homeowner willing to speak with you.
  • The references are all friends, family, or 'we can't share that for privacy' with nothing offered instead.
  • The work shown requires a classification the license does not hold.
  • The projects were performed before the license was issued and no prior licensed entity is named.
  • You are asked for a large deposit before a written scope exists.
08

What a real warranty document says

  • The warranting entity by legal name and license number — not a brand name or a DBA alone.
  • What is covered, stated as specific work, and what is explicitly excluded.
  • The term, and the date the term starts from — substantial completion, final payment, or final inspection.
  • What voids it: third-party modification, deferred maintenance, water chemistry, ground movement, or acts of nature.
  • How to make a claim, in writing, and what response window applies.
  • Whether it transfers to a future owner, at what fee, and with what notice.
  • Which items are manufacturer coverage instead of workmanship coverage, and who files those claims.
09

Why establishment shows up in the build, not just the claim

  • Longevity means the company has seen its own installs age through fifteen Arizona summers and knows which details fail.
  • Established supplier relationships mean material availability and manufacturer support when something needs replacement years later.
  • In-house crews mean the people who built it are the people who come back.
  • A real service process means a claim goes to a system, not to whoever happens to answer the phone.
  • Industry involvement is verifiable: AE's David Bell is the current President of the Southwest Hardscapes Association, with thirteen years on the board and fifteen years involved.
10

Do this in fifteen minutes, for every bid

  • Look up each contractor's ROC license and write down the issue date, status, and classifications.
  • Compare the issue date to the oldest project shown on their website.
  • Request the insurance certificates directly from their insurer or agent.
  • Call two recent homeowners, and ask specifically about a callback after the job finished.
  • Read the warranty text on all bids side by side — that comparison is more revealing than the price comparison.

Keep going

FAQ

Common questions.

A workmanship warranty is a promise to come back and fix something at the contractor's expense. That promise depends entirely on the company still existing, still being licensed, still having crews, and still being willing to answer the phone in year three. The paper does not perform the repair — the company does. Manufacturer coverage on a product is different: it follows the product, but it usually still requires an installer to file, diagnose, and perform the labor, and manufacturer coverage often excludes installation error entirely.

A ten-year workmanship warranty from a company that has been licensed for eight months is a shorter promise than a two-year warranty from a company that has been operating and licensed for fifteen years. Ask for the license issue date, not the marketing line. In Arizona you can look up any ROC license and see when it was issued, what classifications it covers, whether it is active, and whether there is complaint or disciplinary history.

The Arizona Registrar of Contractors record shows the license number, the qualifying party, the license classifications, the issue date, current status, bond information, and any complaint or disciplinary history. Classification matters: a license for one trade does not authorize another. Verify the license on the ROC's own site rather than trusting a number printed on a truck or a website.

Arizona's handyman exemption applies only to work where the total value — labor and materials combined — is under $1,000 for the entire project, and the exemption does not apply when a building permit is required. It is a lifetime threshold for that scope of work, not a per-visit allowance. Most patio, paver, turf, pool, glass-fence and lighting work is well beyond it.

If someone working on your property is not covered by workers' compensation, you can be exposed to liability for injuries that happen on your job. Unlicensed work also removes access to the ROC complaint process and to the Residential Contractors' Recovery Fund, which is available only for work performed by a licensed residential contractor. Confirm the license, the workers' compensation coverage, and the general liability coverage in writing.

Not automatically — but it is a question, and it deserves a straight answer. Legitimate explanations exist: the qualifying party ran a prior licensed entity, the company reorganized, or the owner worked years as a foreman for another licensed contractor. Concerning explanations also exist: the portfolio is stock photography, borrowed subcontractor work, or projects performed unlicensed. Ask three things — which of these projects did your company build under this license, who was the qualifying party at the time, and can I speak with the homeowner from one of them?

Ask for the address or cross-street and the month it was completed, then ask for two references from that same year. Reverse-image search the photo. Ask for a project the crew is on this week that you can drive by. A company that built the work can produce all three without hesitation.

Who is warranting the work by legal entity name and license number; what is covered and what is excluded; how long, from what start date; what triggers voiding; what the response time is; whether it transfers on sale of the home; and how to make a claim in writing. A warranty that cannot answer those questions is a sentence, not a warranty.

Sometimes, and only if the document says so. Transferability, any transfer fee, and any notice requirement are written terms — never assume them. If resale is part of your plan, ask before you sign.

Workmanship coverage is stated in the signed scope for each project, and the glass, hardware, product and material coverage is whatever the manufacturer documents for the products selected. Both are reviewed with you before you sign. Our license, classifications, and issue history are public and verifiable through the Arizona ROC — we would rather you check than take our word for it.

Vet us before you hire us.

Ask for our license number, our issue date, our insurance certificates, and homeowners from projects finished this year. We'll send all of it — then we'll walk your property and put the scope and the coverage in writing.

Start My Project Plan
Your home investment — protected

Why this is an investment, not a cost.

An AE backyard is engineered to add daily livability and long-term home value. We publish honest ranges and build to code with a licensed and bonded Arizona crew. AE provides project-specific workmanship and manufacturer-warranty information in the signed agreement. Website summaries are for planning only.

  • Licensed, bonded & insured in Arizona. ROC 340966 (R-62) · ROC 341002 (R-3) · ROC 347738 (KA-5) · ROC 211530 (CR-21). Most Arizona contracting work valued at $1,000 or more — or requiring a permit — must be performed by a properly licensed contractor, subject to statutory exemptions. Verify the legal entity, license status, and classification with the Arizona Registrar of Contractors.
  • Real ranges, itemized scope. You see materials, finishes, equipment models, and a line-item budget before you sign — not a one-line "pool — $90,000."
Next step

Plan your investment with a designer.

Five minutes, a real range, and no sales pressure. Or vet any Arizona contractor (us included) before you spend a dollar.

Homeowner FAQ

More questions about coverage?

Workmanship versus manufacturer coverage, claims, transfers, and what's in the signed scope — all in the Homeowner FAQ.

Related guides

Keep learning before you build.