Planning for Fall or Spring? Start Early.
Reviewed by the AE Outdoor Living team · Updated Nov 18, 2026
Short answer: Start early. Design, selections, engineering, permits and scheduling come before your build window. As of Nov 2026, typical Phoenix-metro timelines from contract signing to handoff run 4–8 weeks for a paver patio or driveway, 8–16 weeks for a full backyard remodel without a pool, and 16–28 weeks for a new pool. These are planning windows, not guaranteed dates.
Email quotes@aeoutdoorliving.com
$199 plus applicable tax (normally $499), credited toward your project when you hire AE. Reserve your $199 3D design consultation
These are current planning windows, not guaranteed construction dates. Site conditions, design completion, selections, approvals, engineering, permits, HOA review, material availability and signed agreements all affect scheduling.
Why do we publish planning windows?
A start date quoted at the sales table, before design and permits, is hard for anyone to keep. Our approach is a sequence: a fit review, a design commitment, engineered drawings, selections locked, permits per scope, and material staged, then a start date. Publishing current planning windows lets you plan around real capacity instead of a promise.
What does a realistic project timeline look like?
- Fit review and preliminary design: 2–4 weeks from first conversation.
- Design development, selections and engineered plans: 4–8 weeks depending on scope.
- Permit and HOA submittal and approval: 3–10 weeks. Peoria, Phoenix, Scottsdale, Paradise Valley and Fountain Hills all vary, and the first-review windows below show how much.
- Material lead time: 2–12 weeks for premium pavers, glass, custom steel and pool equipment.
- Construction: scope dependent. A patio and turf yard runs 2–3 weeks. A full envelope with pool, kitchen, ramada and glass fencing runs 12–20 weeks.
Every month you shorten the pre-construction runway is a month you push construction into weather, permit backlog or a material shortage.
How do you plan backward from your target date?
As of Nov 2026, our process page gives typical 2026 Phoenix-metro timelines from contract signing to handoff:
| Project | Typical time, contract to handoff |
|---|---|
| Paver patio or driveway | 4–8 weeks |
| Full backyard remodel (no pool) | 8–16 weeks |
| New pool with deck and equipment | 16–28 weeks, including 6–12 weeks of permit and HOA review |
| Full property remodel (pool, landscape and hardscape) | 20–40 weeks |
Permits and approvals are usually the biggest variable:
- Engineering: a licensed engineer stamps structural, drainage, gas, electrical or pool-shell drawings when your scope requires it. Typically 1–3 weeks, longer if scope changes trigger revisions.
- City plan review: first-review windows vary by city. For example, Peoria 3–7 weeks, Phoenix 4–8, Scottsdale 5–10, Surprise 3–6 and Buckeye 4–8.
- Corrections: add 2–6 weeks for each round of plan-check corrections. Pool plans almost always get one round.
- HOA review: usually 30–45 days, and longer if your board meets monthly.
To plan around a season, start at the date you want to be done, subtract the contract-to-handoff range for your project, then allow for the design, selections and engineering stages above. Your actual dates are confirmed in your signed scope.
Why are fall and spring the hardest windows to hit?
Arizona homeowners overwhelmingly want their yard finished before Thanksgiving or before Easter. That concentrates demand on two 8-week windows a year. The only way to land inside one of them is to begin design 4–6 months earlier. If your target is next Thanksgiving, the honest start-planning month is April or May.
Ready to work backward from your date?
- Get an instant price range with PriceGuide. It is an educational planning range, not a quote.
- Book a complimentary on-site assessment or call (623) 300-2589.
- 3D design consultation, one hour at the Peoria design center: $199 plus applicable tax (normally $499), credited toward your project when you hire AE.
Where can you find cost and planning guides?
- Pools: Pool installation cost in Arizona and the all-in pool cost guide
- Pavers: Paver patio cost in Arizona and AE's paver installation standard
- Turf: Artificial turf cost in Arizona and artificial turf base preparation
- Budget and permits: Pricing guide. Permit responsibility follows the signed scope.
Where do things stand today?
- Design review: as of Nov 18, 2026, we are accepting fit reviews. Schedule via /book.
- Peoria showroom visits: by appointment, typical scheduling within the current month.
- Pool planning, landscape and hardscape, AE LEDs, Sonoran Glass: planning windows confirmed during the fit review.
- Project Rescue review: reviewed case by case based on scope and fit.
Planning windows are reviewed and updated during each fit review. AE works under one contract, with one AE team managing every trade, so design, permits and scheduling are planned together. Licenses: ROC 211530, 347738, 341002 and 340966 (see /company-facts).
FAQ
- When should I start planning a pool for fall?
- AE's process page lists a new pool with deck and equipment at 16–28 weeks from contract signing to handoff, including 6–12 weeks of permit and HOA review. Design and engineering come before that, so begin design 4–6 months ahead of the date you want to swim. These are planning windows, not guaranteed dates.
- How long does a paver patio take?
- AE's typical 2026 Phoenix-metro window for a paver patio or driveway is 4–8 weeks from contract signing to handoff. Permits, HOA review, material lead times and weather can change it, so your signed scope confirms the schedule.
- How long do permits and HOA approval take?
- Typical city first-review windows range from about 3 to 10 weeks depending on the city, and each round of corrections can add 2–6 weeks. HOA review is usually 30–45 days, longer if the board meets monthly. Who handles submittals follows your signed scope.
- Why do fall and spring fill up so quickly?
- Most homeowners want to finish before Thanksgiving or Easter, so demand concentrates in two 8-week windows a year. Starting design 4–6 months earlier is the way to land inside one.
- Does AE guarantee a start date?
- No. We publish planning windows, not guaranteed construction dates. A start date comes after the fit review, design, engineered drawings, selections and required approvals, and it is confirmed in your signed agreement.
Ready to plan yours?
- See an instant price range: Get a Ballpark Estimate with PriceGuide. It is an educational planning range, not a quote.
- Book a complimentary on-site assessment, or call (623) 300-2589.
- 3D design consultation: one hour at the Peoria design center, $199 plus applicable tax (normally $499), credited toward your project when you hire AE.
Binding pricing comes only from a written proposal signed by an AE representative. Your signed proposal and agreement control scope, price, warranty and permits.