Guide · Budget & Planning

Should You Build the Pool and Backyard at the Same Time?

Plan the entire outdoor space together. Build it in one coordinated project when the scope, budget, property and approvals are ready—or construct it in planned phases from the same complete design.

The honest version: Plan the entire outdoor space together. Build it in one coordinated project when the scope, budget, property and approvals are ready — otherwise construct it in planned phases from the same complete design.
Completed AE Outdoor Living project in Blackstone at Vistancia: a geometric pool with raised spa, travertine paver decking, frameless glass fencing and layered landscape lighting designed and built as one coordinated backyard.
Completed AE Outdoor Living project in Blackstone at Vistancia — pool, spa, decking, glass fencing, fire features and lighting designed as one coordinated plan.

By David “Dave” Bell, Founder and Owner of AE Outdoor Living

Published · Last reviewed

Direct answer

For most pool-and-backyard projects, the smartest approach is simple:

Plan the entire outdoor space together. Build it in one coordinated project when the scope, budget, property and approvals are ready. If they are not, construct it in planned phases from the same complete design.

What usually creates expensive problems is not phasing. It is completing pavers, turf, landscaping or structures without accounting for the access, drainage, utilities, footings and elevations required by a future pool or backyard phase.

Planning together does not mean every crew works in the yard at the same time. A coordinated project still follows a controlled construction sequence.

A blunt disclosure before we go further

AE Outdoor Living designs and builds complete pool-and-backyard projects, so we obviously benefit when a homeowner hires us for a coordinated project.

That does not mean every homeowner should build everything immediately.

If completing the full yard would eliminate a reasonable contingency, force compromises on important construction work or commit you to features you are not sure about, planned phasing may be the better decision.

Our position is not that everything must be constructed at once. Our position is that everything should be considered before the first phase permanently affects the next one.

The three honest paths

Build the complete project in one coordinated plan

This works best when

  • The complete scope is understood
  • The property conditions have been reviewed
  • The investment is available without eliminating reasonable flexibility
  • The pool, decking, structures, utilities and drainage strongly interact
  • The homeowner wants one primary construction period
  • Major selections are settled enough to keep the design from changing constantly

Main advantage

Fewer handoffs and fewer finished areas that must be protected, reopened or rebuilt later.

Main risk

A large project can become financially or operationally stressful when the scope is not fully defined before construction.

Create the complete plan but construct it in phases

This works best when

  • The long-term vision is understood
  • The full construction investment is not responsible right now
  • One feature is the clear first priority
  • Future features can be located accurately enough to protect access and install necessary preparation
  • The homeowner accepts multiple construction periods
  • Phase one can be completed without trapping or damaging phase two

Main advantage

The homeowner can spread construction over time while protecting the complete design.

Main risk

Poorly planned phases create duplicate mobilization, material-matching problems and demolition of recently completed work.

Pause before construction

This works best when

  • The property boundaries, easements or access are unresolved
  • The pool or total project does not fit the current responsible investment range
  • Major features are still changing
  • Utility, drainage, retaining or engineering questions remain unanswered
  • The homeowner cannot fund phase one and the preparation required to protect later phases

Main advantage

A pause costs less than building the wrong first phase.

Main risk

Starting because everyone is excited can create a permanent layout around temporary assumptions.

One complete plan. A controlled construction sequence.

Original AE illustration — not a photograph of a completed project.

Dependency flow for a coordinated pool and backyard projectSeven stacked stages connected by downward arrows. Stage one is the complete master plan. Stage two is the property, access, drainage and approval review. Stage three is demolition, rough grading and excavation. Stage four is the pool shell, underground utilities, bonding and structural footings. Stage five is the required inspections before work is covered. Stage six is pool decking, patios, structures and finished hardscape. Stage seven is irrigation, turf, planting, lighting and final barriers. Each stage depends on the stage above it being complete or coordinated first.1
Complete master plan
2
Property, access, drainage and approval review
3
Demolition, rough grading and excavation
4
Pool shell, underground utilities, bonding and structural footings
5
Required inspections before work is covered
6
Pool decking, patios, structures and finished hardscape
7
Irrigation, turf, planting, lighting and final barriers

Typical coordination logic only. The engineer, approved plans, inspections and actual property conditions control the sequence for a specific project.

Why the pool often controls the backyard decision

A pool is usually one of the most difficult features to add after a yard is finished.

Pool construction may require:

  • An excavation route
  • Soil-removal access
  • Temporary wall or gate removal
  • Underground plumbing and electrical work
  • Equipment-pad placement
  • Grading and drainage coordination
  • Coping and deck transitions
  • Bonding coordination with surrounding surfaces
  • Temporary and permanent barrier planning
  • Inspections before work is covered

That is why a future pool must be considered before finished pavers, turf, planting or structures block its access or conflict with its elevations.

However, this does not mean the pool is always literally the first work performed. Demolition, retaining, slope stabilization, drainage corrections, utility conflicts or structural preparation may need to happen first.

The approved plans, engineering, inspections and actual site conditions control the final sequence.

Related guide
Can a Pool Physically Fit on the Property?

Check access, easements, utilities, drainage and the usable pool envelope before deciding how to phase the yard.

What “building everything together” actually means

It does not mean stacking five crews in one backyard and hoping they stay out of each other’s way.

A coordinated pool-and-backyard project should have:

  • One complete site plan
  • Shared finished elevations
  • One drainage strategy
  • Coordinated equipment and utility routes
  • Pool, structure and hardscape details that physically connect
  • Materials selected as one exterior environment
  • A dependency-based construction schedule
  • Clear permit and engineering responsibility
  • Written scope boundaries
  • One identified party responsible for resolving conflicts

Even when one company manages everything, separate permits, drawings, engineering reviews, inspections or specialty trades may still be required.

One coordinated project simplifies responsibility. It does not magically turn the work into one permit or one construction phase.

When building the complete project together makes sense

Building the pool and backyard in one coordinated project is usually the stronger option when the pool, decking, shade, kitchen, fire features, fencing, drainage and utilities are tightly connected.

It can reduce the risk of:

  • Reopening completed surfaces
  • Rebuilding access routes
  • Trenching through new pavers
  • Moving irrigation installed in the wrong location
  • Adding structural footings beneath completed hardscape
  • Trying to match discontinued materials
  • Creating conflicting elevations
  • Sending multiple contractors back to restore the same area

That does not guarantee a lower final price or a faster completion date. It means the project has fewer avoidable interfaces and fewer assumptions between separate scopes.

See how AE coordinates complete backyard transformations. →

When planned phasing is the smarter decision

Phasing can be a responsible choice when the complete design exists but the homeowner does not want to fund or construct every feature immediately.

Examples include:

  • Building the pool and essential surrounding deck now
  • Adding the ramada or outdoor kitchen later
  • Installing basic landscape now and upgrading specimen planting later
  • Completing necessary utility sleeves while delaying optional appliances
  • Preparing structural pads while postponing the structure
  • Reserving a future fire, lighting or audio zone

The goal is not to install every possible rough-in “just in case.” That can waste money too.

The goal is to make informed decisions about the future features that are likely enough to affect phase one.

AE tool
Phased Project Planner

Answer a short set of questions and get a personalized phase roadmap for your property and priorities.

What must be considered before finished surfaces close access

  • Construction access

    Why it matters

    Future pool excavation, soil removal and heavy structural work need a practical route.

    Decide early

    Identify and preserve the access lane or account for the work required to reopen it.

  • Finished grades and drainage

    Why it matters

    The pool, coping, decking, patios, turf and landscape must move water through one coordinated system.

    Decide early

    Establish the overall elevation and drainage strategy before permanent surfaces lock it in.

  • Electrical service and conduit

    Why it matters

    Pools, kitchens, structures, lighting, heaters and controls can affect service capacity and routing.

    Decide early

    Have qualified professionals determine expected loads and practical pathways before concrete or pavers cover them.

  • Gas, water and drain routes

    Why it matters

    Pool heaters, kitchens, fire features, sinks and misting can require different utilities and approvals.

    Decide early

    Locate likely future features and determine which routes should be installed or protected during the current phase.

  • Structural footings and pads

    Why it matters

    Ramadas, patio covers, fireplaces, walls and some kitchens may need support below the finished surface.

    Decide early

    Coordinate structural locations before installing hardscape that would later need removal.

  • Pool equipment location

    Why it matters

    Equipment placement affects plumbing, electrical, noise, visibility and service access.

    Decide early

    Reserve a realistic equipment area and utility route as part of the overall plan.

  • Irrigation and sleeves

    Why it matters

    Irrigation mains or future utility crossings may need to pass below decking, driveways or patios.

    Decide early

    Plan necessary crossings before the finished surface is installed.

  • Lighting, low-voltage and controls

    Why it matters

    Future landscape lighting, audio, cameras and controls may need protected pathways.

    Decide early

    Identify likely system routes without pretending every future technology can be predicted.

  • Material and elevation transitions

    Why it matters

    Pool coping, decking, pavers, turf, thresholds and structures have to meet cleanly.

    Decide early

    Document finished elevations and material termination details before separate contractors price their work.

  • Temporary and permanent barriers

    Why it matters

    Pool construction can affect walls, gates and required barriers.

    Decide early

    Assign responsibility for construction fencing, permanent barriers, gate restoration and final approvals.

The right preparation is property- and design-specific. This table is a coordination checklist, not a universal construction specification.

Can separate contractors successfully build the project?

Yes—but someone still has to own the overall plan and the interfaces between scopes.

Separate contractors can work successfully when they receive the same current plans and the written scopes clearly identify:

  • Who controls layout and finished elevations
  • Who owns grading and drainage
  • Who provides and restores access
  • Who coordinates utility routes
  • Who installs sleeves and when
  • Who owns pool-deck and coping transitions
  • Who handles bonding around pool-adjacent surfaces
  • Who obtains each permit and inspection
  • Who protects completed work
  • Who repairs damage between scopes
  • Where one warranty ends and another begins
  • Who approves field changes to the common plan

Without those assignments, each contractor may complete their individual scope correctly while the overall yard still fails to come together.

One qualified design-build contractor can simplify coordination and accountability. Separate qualified contractors can also succeed when the homeowner or an independent professional actively manages the shared plan.

What does not work is assuming that five independent proposals automatically create one coordinated backyard.

Arizona conditions that make coordination more important

Arizona adds several property conditions that should be considered across the whole outdoor space:

  • Caliche or hard excavation
  • Compact side yards and temporary wall removal
  • Monsoon drainage
  • Retaining conditions and elevation changes
  • Underground and overhead utilities
  • Pool-equipment and heater routes
  • HOA design review
  • City or county permits
  • Pool barriers and gates
  • Extreme heat affecting some planting and finish schedules

Where homeowners commonly pay twice

These are categories of preventable rework:

  • Removing new turf or pavers for equipment access
  • Cutting finished surfaces for utilities
  • Relocating drains after grades change
  • Rebuilding irrigation in a later construction zone
  • Adding structural footings beneath completed hardscape
  • Replacing damaged landscaping along an access route
  • Reworking pool-deck or patio elevations
  • Moving equipment that conflicts with a future structure
  • Buying additional mobilization and site restoration
  • Trying to source an exact material match years later
  • Paying separate contractors to diagnose responsibility for the same conflict

Sometimes these costs are unavoidable because the homeowner’s needs change. The mistake is creating them through a first phase that ignored an already-known future plan.

How to phase the yard without destroying phase one

If the project will be constructed over time:

  1. Complete the full master layout first.
  2. Decide which future features are likely enough to affect phase one.
  3. Preserve pool and heavy-equipment access.
  4. Coordinate overall grades and drainage.
  5. Install or protect the underground routes that genuinely need to cross finished surfaces.
  6. Locate future structural footings and equipment areas.
  7. Keep expensive planting out of known future construction lanes.
  8. Document concealed work and actual installed locations.
  9. Establish clean temporary edges where a future phase will connect.
  10. Update the master plan whenever a major decision changes.

A phased project should look intentionally paused—not accidentally unfinished.

What should exist before contractors price the work?

  • Complete feature list
  • Property and access information
  • Master layout
  • Current finished elevations or grading information where needed
  • Drainage strategy
  • Current and future utility needs
  • Structural and equipment locations
  • Phase boundaries
  • Material and transition details
  • Permit and HOA responsibilities
  • Total desired investment range
  • Phase-one investment range
  • Construction-priority list
  • Coordination responsibility
  • Written assumptions and exclusions

If contractors are pricing different assumptions about future phases, the proposals are not truly comparable.

Related guide
Why a Paid Design Should Come Before Contractor Bids

A complete, transferable plan gives each contractor the same defined project to price.

Real AE project proof

Coordinated complete project · Peoria

Blackstone at Vistancia Backyard Resort

Verified scope: custom pool, raised spa, travertine paver decking, artificial turf, fire features, landscape lighting and frameless glass fencing.

Systems that interacted: pool and spa, decking elevations, glass fencing and hardware, equipment and utility routing, drainage away from the home, and the lighting plan.

Documented coordination decision: the builder-grade slab was removed and the yard re-graded for drainage away from the house, and the equipment pad was routed off the view side before decking and glass hardware were set.

See the complete project →
Coordinated complete project · Goodyear

Estrella Outdoor Living Remodel

Verified scope: geometric pool, raised spa and waterfalls, travertine decking, shade pergola, outdoor fireplace, wood gazebo, artificial turf and pavers, and landscape lighting.

Systems that interacted: pool and spa, hardscape, structures, landscape and lighting across a long lot with multiple elevation changes.

Documented coordination decision: the entire yard was master-planned up front, with zone-to-zone sightlines and drainage across the elevation changes resolved before construction sequencing began.

See the complete project →

Both examples are documented as complete coordinated projects. Neither project page documents a phased construction history, so neither is presented as a phasing case study.

AE’s honest recommendation

For a substantial pool-and-backyard project, design the complete space before deciding how much to build now.

If the scope, investment, property and approvals are ready, one coordinated construction project can reduce avoidable interfaces and repeated disruption.

If the complete construction investment is not responsible right now, phase it—but protect the access, drainage, underground systems, structural needs and finished elevations required by the later work.

If those decisions are still unclear, pause before construction.

The worst option is not phasing. The worst option is completing phase one as though phase two will never happen when everyone already knows that it will.

Related planning and investment guides

FAQ

Common questions.

No. A coordinated project may reduce repeated access work, mobilization and reconstruction, but it does not guarantee a lower price. The complete scope, site conditions, selections and contractor responsibilities determine the actual number.

Heavy pool excavation and underground work generally need to happen before finished landscaping or hardscape blocks access. However, demolition, drainage, retaining, utility or site-stabilization work may need to happen before pool excavation. Follow the property-specific approved plan and inspection requirements.

You can, but only after deciding how future excavation access, utilities, drainage and finished elevations will work. Otherwise, some of the new pavers or turf may need to be removed and rebuilt.

That depends on their locations, footings, utilities, permits and interaction with pool construction. Their positions should be included in the same master plan even if their actual installation occurs later.

Some work may occur outside the active construction and access areas, but stacking trades indiscriminately can cause damage, interfere with inspections and create safety problems. The project schedule should be based on dependencies, not on keeping every crew busy at once.

Yes. Both should work from the same current plan, with written responsibility for elevations, drainage, utilities, access, transitions, permits, protection and warranty boundaries.

No. A coordinated project may still require separate permits, drawings, engineering reviews and inspections for the pool, structures, gas, electrical, fencing or other work.

Only the systems that are sufficiently defined and would be expensive or disruptive to add later. These may include utility sleeves, gas or electrical routes, drainage, structural footings, irrigation crossings or low-voltage pathways. The actual preparation must be designed for the property and future feature.

Yes. The pool phase should still account for the final deck edges, drainage, future access, equipment, structures, utilities and landscape transitions.

Start with work that controls access, safety, drainage, underground systems, structural support and the permanent layout. Use the Phased Project Planner, then have the plan reviewed before construction.

Decide what must happen now—and what can safely wait.

AE can review the pool, complete backyard, access, utilities and investment priorities as one project. We will identify what should be built in the first phase, what can wait and what must be prepared before finished work closes the yard.

Build My Investment Range →

Official sources used for this guide

  • Scottsdale Pool Site Plan Requirements
  • Phoenix Residential Pool/Spa Submittal Guideline
  • Phoenix Residential Inspections
  • 2024 IRC Pool Perimeter-Surface Bonding
  • Arizona Underground-Facility Excavation Requirements
  • Phoenix Grading and Drainage
  • Maricopa County Drainage Regulations

Requirements and construction sequences vary by jurisdiction, permit date, approved plans, property conditions, utilities and engineering. The project-specific plans and responsible authorities control.

Decide what must happen now — and what can safely wait.

AE reviews the pool, complete backyard, access, utilities and investment priorities as one project, then identifies what belongs in phase one.

Build My Phased Project Plan
Your home investment — protected

Why this is an investment, not a cost.

An AE backyard is engineered to add daily livability and long-term home value. We publish honest ranges and build to code with a licensed and bonded Arizona crew. AE provides project-specific workmanship and manufacturer-warranty information in the signed agreement. Website summaries are for planning only.

  • Licensed, bonded & insured in Arizona. ROC 340966 (R-62) · ROC 341002 (R-3) · ROC 347738 (KA-5) · ROC 211530 (CR-21). Most Arizona contracting work valued at $1,000 or more — or requiring a permit — must be performed by a properly licensed contractor, subject to statutory exemptions. Verify the legal entity, license status, and classification with the Arizona Registrar of Contractors.
  • Real ranges, itemized scope. You see materials, finishes, equipment models, and a line-item budget before you sign — not a one-line "pool — $90,000."