Illustrated planning concept · Final design follows field verification and approved project documents
Swim-Up Pool Bar
In-pool barstools facing a covered swim-up bar.
- Size range
- 8'-14' bar facing pool
- Installed investment range
- $48,000 – $95,000 (incl. pool integration)
- Best for
- Resort-feel pool builds, vacation properties
Two pages: concept rendering, planning dimensions, option decisions, and verification checklist. No email required.
Start with this conceptAn illustrated starting point
This concept is not a permit, engineering, fabrication, appliance-cutout, code-approval, or construction drawing. Field measurements, selected manufacturer documents and listings, site and utility conditions, required qualified engineering, AHJ/HOA review, approved documents, and the signed scope control the final design. The installed investment range is for planning, not a quote.
About this design
Submerged underwater seating bench facing a poolside bar with thatch or wood-roof cover. Includes outdoor fridge, sink, bar-top with drip edge, and overhead fan/lighting.
Key features
- · Submerged in-pool concrete bar stools (4-6)
- · Covered bar w/ wood, tile, or thatch roof
- · Outdoor fridge + sink + ice
- · Drip edge bar top
- · Overhead fan + lighting listed for their intended locations
Equipment & systems
- · Outdoor-rated refrigerator — confirm the listing for the selected model
- · Outdoor sink with drain routing per the approved plumbing design
- · Ceiling fan listed for its intended location
- · Landscape and underwater lighting listed for their locations
- · Insulated ice bucket
How this kitchen is planned
Two structures that have to agree with each other: submerged seating inside the pool, and a covered bar on the deck directly across the counter from it.
Service only. Drinks and cold food handed across the counter to swimmers.
Four to six seated in the water, with deck-side guests behind them — the most resort-feeling of the nine.
The roof is non-negotiable here. Shade over the bar top is what makes swim-up seating usable in an Arizona summer afternoon.
Everything is wet. Refrigeration, the sink, lighting and the fan all sit in a splash and chemical environment, and the in-pool seating is part of the pool structure.
Layout zones this concept reserves
- AIn-pool seating
Submerged stools formed as part of the pool structure
- BBar counter
Counter spanning water side to deck side with a drip edge
- CService side
Refrigeration, sink and ice on the dry deck side
- DRoof + fan
Covered structure, fan and wet-location lighting above the bar
- EPool interface
Bond beam, waterline and deck transition at the bar face
Finish and material zones
- In-pool stools
- Finished in the pool's interior material so seating reads as part of the pool.
- Bar top
- Tile or stone with a drip-edge profile so water sheds back toward the pool.
- Roof
- Cedar or palapa thatch — a maintenance choice as much as an aesthetic one.
- Deck transition
- Coordinate deck material and slope at the service side so it drains away from equipment.
Lock these before appliances are ordered
- Seat count and where the bar face lands along the pool edge
- Roof type and whether a fan is included
- Which appliances live on the service side
- Bar top material and drip-edge profile
- Underwater and overhead lighting scenes
- Whether this is built with the pool or retrofitted to an existing one
Verified before anything is built
- Water depth, seat geometry, bar-top relationship to waterline and bond-beam detail — confirmed by the approved pool design and field conditions
- Electrical bonding, equipotential requirements and wet-location listings for every fixture and appliance — confirmed by the qualified electrical trade
- Sink supply, drain routing and separation from pool water — confirmed by the qualified plumbing trade
- Roof structure, spans, footings and attachment near the pool — confirmed by qualified engineering
- Coordination sequence with the pool builder when the pool already exists
- AHJ, HOA and manufacturer requirements for this address and this scope — confirmed in writing before construction
Planning this kitchen in Arizona
Heat and shade exposure
Decide where the cook stands in July before you decide on finishes. Shade over the working side changes how usable the kitchen is, how hot the counter gets, and how quickly stainless and dark slab surfaces become uncomfortable to touch. If a cover is part of the plan, it is designed with the kitchen — not added afterward.
Drainage and cleanability
Plan for dust, rain, spills and appropriate cleaning that follows the selected finish and equipment instructions, without spraying appliances or electrical components. Counter slope, deck slope away from the cabinetry, grease handling, and a drain path that does not run toward appliances or the house all get settled in the approved design, using field-measured grades rather than assumptions.
Wind and smoke orientation
Wind direction affects whether smoke drifts into your seating or away from it. AE considers observed site wind patterns and nearby structures when planning the cooking side at your address. Any ventilation approach follows the selected appliance's instructions and the listed venting components — not a general rule of thumb.
Utilities and service access
Fuel type, meter capacity, run length, total connected load, and electrical circuits are verified by the qualified trades in the signed scope. Just as important: every appliance, shutoff, and connection needs to be reachable years from now, so service access is drawn before cabinetry is fabricated.
AHJ, HOA and manufacturer coordination
Requirements vary by address, by scope, and by the product you select. Municipal or county review, HOA architectural approval where one applies, and each manufacturer's installation instructions and listing all have to agree with the drawings before anything is built. AE builds to the approved written scope.
This planning board is a concept-stage tool. It is not permit, engineering, fabrication, appliance-cutout, code-approval, safety-inspection, or construction documentation. Field measurements, the selected manufacturer documents and listings, required qualified engineering, AHJ and HOA review, approved documents, and the signed scope control the final build.