Illustrated planning concept · Final design follows field verification and approved project documents

Kitchen Library · Tuscan / chef pavilion

Pizza Oven Pavilion

Wood-fired pizza oven + grill + prep kitchen under cover.

Size range
12' x 16' minimum covered area
Installed investment range
$55,000 – $110,000
Best for
Entertainers, food enthusiasts, large estates

(623) 300-2589

Two pages: concept rendering, planning dimensions, option decisions, and verification checklist. No email required.

Start with this concept

An illustrated starting point

This concept is not a permit, engineering, fabrication, appliance-cutout, code-approval, or construction drawing. Field measurements, selected manufacturer documents and listings, site and utility conditions, required qualified engineering, AHJ/HOA review, approved documents, and the signed scope control the final design. The installed investment range is for planning, not a quote.

About this design

Covered kitchen pavilion centered on a wood-fired pizza oven (Forno Bravo or Mugnaini), with adjacent grill, prep counter, and bar. Custom hood ventilation, lighting, and seating.

Key features

  • · Forno Bravo or Mugnaini wood-fired oven (32"-44" hearth)
  • · Built-in grill + side burner
  • · Custom stainless vent hood above oven
  • · Bar seating with copper tap option
  • · Roof tile, beam ceiling, fan lighting

Equipment & systems

  • · Forno Bravo Casa2G110 or Mugnaini Medio
  • · Lynx or DCS 36" grill
  • · Custom stainless vent hood sized for the selected oven
  • · Outdoor fridge + tap fridge
  • · Outdoor TV w/ Strongarm mount
  • · Electrical service sized for selected equipment and total connected load
AE Kitchen Planning Board

How this kitchen is planned

Covered pavilion

A roofed room built around one heavy object. The wood-fired oven anchors a wall, the grill and prep counter run beside it, and bar seating sits across the open span.

How you cook

Wood-fired cooking as the event — long heat-up, a crowd watching, with a gas grill for everything else.

How guests gather

Four to eight at the bar with a sightline to the oven mouth; the oven is the focal point, not the TV.

Shade and structure

Full roof with a beam ceiling and fans. Because it is a covered structure, exhaust, roof penetration and clearances become structural questions, not finish questions.

Wet, cold and live fire

Live fire under a roof plus a plumbed prep counter and refrigeration. The oven's exhaust path through the roof assembly is the controlling detail of the entire concept.

Layout zones this concept reserves

  1. A
    Oven hearth

    Wood-fired oven, its support base and the reserved exhaust path

  2. B
    Grill + prep

    Gas grill and prep counter within reach of the oven mouth

  3. C
    Wood + service

    Fuel storage and back-of-house access kept out of the guest path

  4. D
    Bar + seating

    Bar run across the open side with a view of the fire

  5. E
    Pavilion structure

    Columns, roof, beam ceiling and fan/lighting layout

Finish and material zones

Oven surround
Stone or brick enclosure — its dimensions follow the selected oven, not the other way around.
Pavilion walls and columns
Match the house masonry or commit fully to a contrasting Tuscan palette.
Ceiling
Tongue-and-groove or exposed rough-sawn beams; decide early because lighting and fans mount to it.
Counters
Heat-tolerant slab adjacent to the oven mouth; confirm the material with the fabricator.

Lock these before appliances are ordered

  • Oven make, model and hearth size — everything else is laid out around it
  • Fuel: wood-only or a gas-assist model
  • Pavilion footprint and ceiling height before columns are located
  • Where the exhaust leaves the structure
  • Whether the bar carries a tap or stays a dry bar
  • Ceiling finish, fan count and lighting circuits

Verified before anything is built

  • Oven support, foundation and dead load — confirmed by qualified engineering and the oven manufacturer's documents
  • Exhaust, chimney, roof penetration and combustible clearances — confirmed against the listed venting system and the approved roof assembly
  • Selected appliance cutout drawings, insulated-jacket requirements and listings — obtained before cabinetry is fabricated
  • Fuel type, meter capacity, run length, total connected load and electrical circuits — confirmed by the qualified trades in the signed scope
  • Pavilion structure, spans, wind and attachment — confirmed by qualified engineering
  • AHJ, HOA and manufacturer requirements for this address and this scope — confirmed in writing before construction

Planning this kitchen in Arizona

Heat and shade exposure

Decide where the cook stands in July before you decide on finishes. Shade over the working side changes how usable the kitchen is, how hot the counter gets, and how quickly stainless and dark slab surfaces become uncomfortable to touch. If a cover is part of the plan, it is designed with the kitchen — not added afterward.

Drainage and cleanability

Plan for dust, rain, spills and appropriate cleaning that follows the selected finish and equipment instructions, without spraying appliances or electrical components. Counter slope, deck slope away from the cabinetry, grease handling, and a drain path that does not run toward appliances or the house all get settled in the approved design, using field-measured grades rather than assumptions.

Wind and smoke orientation

Wind direction affects whether smoke drifts into your seating or away from it. AE considers observed site wind patterns and nearby structures when planning the cooking side at your address. Any ventilation approach follows the selected appliance's instructions and the listed venting components — not a general rule of thumb.

Utilities and service access

Fuel type, meter capacity, run length, total connected load, and electrical circuits are verified by the qualified trades in the signed scope. Just as important: every appliance, shutoff, and connection needs to be reachable years from now, so service access is drawn before cabinetry is fabricated.

AHJ, HOA and manufacturer coordination

Requirements vary by address, by scope, and by the product you select. Municipal or county review, HOA architectural approval where one applies, and each manufacturer's installation instructions and listing all have to agree with the drawings before anything is built. AE builds to the approved written scope.

This planning board is a concept-stage tool. It is not permit, engineering, fabrication, appliance-cutout, code-approval, safety-inspection, or construction documentation. Field measurements, the selected manufacturer documents and listings, required qualified engineering, AHJ and HOA review, approved documents, and the signed scope control the final build.