Skip to main content
AE Outdoor Living
Arizona licensed, bonded & insured·Serving Arizona homeowners since 2005·Peoria design showroom·Written, itemized project scopes·Project-specific payment & warranty terms
West Valley · Peoria, AZ

Trilogy at Vistancia pool builder & outdoor living.

Refined outdoor spaces for Trilogy's active-adult homeowners.

Why Homeowners In Trilogy at Vistancia Choose AE

Built for the way Trilogy at Vistancia lives.

Trilogy at Vistancia attracts homeowners who've already done one renovation and know exactly what they don't want again. Our Trilogy projects lean clean, low-maintenance, and built around how you actually entertain — not how a brochure says you should.

We've built plunge pools, spool/spa combos, low-profile pergolas, and full outdoor kitchens on Trilogy lots from the Mita Club out to the perimeter villages.

Signature Builds For Trilogy at Vistancia

What we build here, and why it works.

Plunge pools and spools sized to Trilogy lot footprints

Single-level decking with zero trip transitions

Louvered aluminum pergolas — remote operated, low maintenance

Built-in seating walls instead of loose patio furniture

Local notes
  • Trilogy lots tend to be tighter than the rest of Vistancia — we design for sight lines from inside the home first, then work outward.
  • We handle the Trilogy modification submittal package end-to-end.
Your Trilogy at Vistancia build, step by step

From first call to final swim.

The path looks the same in every neighborhood. What changes is what AE plans around — your lot, your HOA submittal package, and how the yard actually gets used.

  1. 01
    Design consult

    On-site walk in Trilogy at Vistancia. We talk goals, lot constraints, sun, sight lines, and budget range — before any drawings.

  2. 02
    3D design & proposal

    A full 3D model with materials, finishes, and an itemized fixed-price scope. No surprise exclusions.

  3. 03
    Permits & HOA submittal

    AE pulls permits in our ROC license — never yours — and prepares the Trilogy at Vistancia HOA package where required.

  4. 04
    Build & final walk

    One AE crew, one project manager, weekly schedule updates. Punch list cleared before final payment.

Payment schedule

Set in your signed proposal.

Pool and non-pool projects follow different milestone schedules, and the exact terms for your scope are documented in your written agreement before work starts. Pool projects use a milestone schedule aligned with Arizona ROC requirements.

See full pricing & payment guide →
Permits & HOA in Trilogy at Vistancia

Defined in your signed scope.

Permit and HOA responsibilities are defined in the signed proposal. When included in AE's written scope, our team may prepare, coordinate, or submit applicable documents and inspections in Peoria. Approval remains subject to the governing authority or association.

Building In Trilogy at Vistancia

Ready to start your Trilogy at Vistancia outdoor project?

Get a transparent starting range in under 5 minutes, then book a design consultation with a senior member of our team.

Related guides

Keep learning before you build.