Skip to main content
AE Outdoor Living
Arizona licensed, bonded & insured·Serving Arizona homeowners since 2005·Peoria design showroom·Written, itemized project scopes·Project-specific payment & warranty terms
Outdoor & Permanent Lighting in Arizona

Outdoor & Permanent Lighting

Landscape, architectural, pool-area, and permanent roofline lighting — designed and installed by AE LEDs, our specialty lighting division.

Quick planning summary

Quick planning summary

Best for
Homeowners planning this scope in Arizona.
Planning investment
Ranges vary by scope — see Pricing Guide.
Typical timeline
Confirmed in your signed scope.
Service area
Phoenix metro — Peoria, Glendale, Surprise, Scottsdale, Cave Creek, Paradise Valley, and surrounding cities.
AE division
AE LEDs (permanent lighting) · landscape lighting by AE crews

Ranges are planning guidance and reviewed periodically. Final figures live in your signed proposal.

AE project in New River — New River Resort Backyard
Real AE project · New River

A full resort transformation in New River, AZ — pool with in-water basketball, raised infinity-edge spa with fire trough and rain-curtain feature wall, stacked-stone ramada with outdoor TV and fireplace, color-changing pool and landscape lighting, and shade sails framed by metal palm sculptures.

Options & features

What AE currently offers for this scope

Only options we actively design, source, and build today. Ask in your intake if you don't see what you're picturing.

  • Landscape & pathway lighting
  • Tree & plant lighting
  • Architectural lighting
  • Pool-area & water-feature lighting
  • Smart lighting controls
  • Permanent roofline lighting
  • Holiday & accent lighting
  • Designed & installed by AE LEDs

Use the right planning tool for this project.

Use these first, then send AE the result so we can review your project with better context.

Looking for permanent roofline or holiday-capable lighting?

The AE LEDs division installs permanent track-mounted RGBW fixtures along your roofline, soffit, and architectural lines — separate from landscape, path, and uplight work covered on this page.

Visit AE LEDs
Realistic lighting timelines

How AE LEDs actually builds and installs a system

Every AE LEDs track is custom-built in-house. We paint or use powder-coated aluminum for every track — sometimes we can match a home with a stock powder-coat color, and every system is built for that specific home. None of what we install is a big-box cookie-cutter product.

  1. Phase 1

    Deposit & trim color match

    Week 0

    Confirm scope, pick the trim/track color to match your roofline or soffit, and lock the design. Custom fabrication starts once color is signed off.

  2. Phase 2

    In-house fabrication

    ~3–5 weeks

    Track cut and finished to your home's linear footage, corner and end conditions built to spec, controller and channel components staged for install.

  3. Phase 3

    Install & commissioning

    ~1–3 days on-site

    Mount track, run channel, terminate the controller, program scenes and schedules, and walk the homeowner through the app.

Typical timeline from deposit and trim color pick to install is 4–6 weeks. If you have a fixed deadline (holidays, an event, listing photos), we can often push the schedule up — usually at some additional cost.

Because the system is built for your home, we won't ship half-finished track just to hit a date. What we install is what we stand behind.

Timing FAQ

How long from deposit to install on a permanent lighting system?

Usually 4–6 weeks. That covers trim color match, in-house track fabrication for your home's specific linear footage and corner conditions, and the 1–3 day on-site install and commissioning.

Can you install in time for the holidays or a specific event?

Often yes. If your deadline is tight we can push the schedule up — that usually carries some additional cost and depends on our fabrication queue at the time. We'll quote standard and rush timelines side-by-side.

What can delay a lighting install?

Trim color match confirmation, HOA approval on architectural review, roofline access on two-story or complex elevations, and controller/power routing coordination are the most common. Weather rarely stops us, but high winds can pause work at height.

Why not just install a stock system faster?

Because a stock big-box channel isn't cut for your home. Corners, gable returns, and end conditions get forced instead of built — and it shows in daylight. Custom fabrication is why AE LEDs looks like architecture, not accessory.

Typical timing depends on design, selections, access, site conditions, materials, weather, approvals, inspections, engineering, product availability, and current schedule. On-site install time is different from the full project timeline — preconstruction, approvals, materials, and coordination happen before visible field work begins.

Landscape lighting · Phoenix metro

Landscape, path, and uplighting across the Valley

Low-voltage landscape lighting — path, uplight, downlight, and hardscape integration — using FX Luminaire and Volt brass fixtures on transformer-protected runs. For permanent roofline RGBW lighting, see the AE LEDs division.

  • Phoenix
  • Scottsdale
  • Paradise Valley
  • Arcadia
  • Cave Creek
  • Carefree
  • Fountain Hills
  • Peoria
  • Glendale
  • Surprise
  • Goodyear
  • Litchfield Park
  • Avondale
  • Chandler
  • Gilbert
  • Mesa

Every layout is night-walked with the homeowner before final aim and burial.

Construction standards

How we build it, summarized

  • — Written, itemized scope before any work begins; no verbal change orders.
  • — Engineering, drainage, and code review documented in the approved design.
  • — Manufacturer instructions and current AZ code govern installation methods.
  • — Photo documentation captured at each major milestone for the project file.

Final specifications depend on the approved design, site conditions, engineering, applicable code, manufacturer instructions, and signed scope.

See full Construction Standards →
Payment, permit & warranty

Set in your signed proposal

Your signed proposal and agreement control payment milestones, permitting responsibilities, warranty coverage, exclusions, and project scope. Pool and non-pool projects follow different milestone schedules.

Warranty summary

What's covered, and by whom

AE provides a two-year workmanship warranty unless a signed agreement states otherwise. Manufacturer warranties apply where applicable and vary by product. Your signed agreement and manufacturer documentation control coverage.

  • AE LEDs (permanent lighting)
    AE workmanship: 2-year workmanship
    Manufacturer: Manufacturer component warranty (varies by product)

Website information is for planning purposes. Your signed proposal and agreement control the scope, payment schedule, warranty, and project responsibilities.

Ready to plan this the right way?

One accountable team — design, written scope, build, and aftercare.

Related guides

Keep learning before you build.