Complete Backyard Transformations in Arcadia
one team, one contract, one warranty
Complete backyard transformations are what we do best — pool, hardscape, landscape, shade, kitchen, lighting, and glass coordinated through one project manager. No subbing to four contractors who don't talk to each other.
What's different about complete backyard in Arcadia
Flood irrigation changes everything about base prep, drainage, and turf selection. We engineer paver assemblies to survive saturation cycles, design landscape around the existing canopy instead of clearing it, and never specify materials that fail wet.
Scope of work
- Pool design, build, and finish
- Hardscape — patios, walkways, pool decks, driveways
- Landscape — plants, irrigation, grading, decomposed granite
- Shade — pergolas, ramadas, louvered systems
- Outdoor kitchens and fire features
- Lighting (AE LEDs) and glass (Sonoran Glass & Fence)
The non-negotiables
- One project manager from contract to final walkthrough
- 50% deposit, 35% at project start or materials delivery, 15% at completion (non-pool)
- Pool work follows separate ROC-compliant pool schedule
- 2-year workmanship warranty across every scope we self-perform
Complete Backyard in Arcadia — FAQ
How long does a complete backyard take?+
Most complete builds run 4–8 months from contract to walkthrough, depending on pool scope, permit timing, and material lead times.
Do I have to commit to everything at once?+
No — most complete projects phase logically. Pool and major hardscape first, then kitchen, lighting, and finish landscape. We plan the full vision and execute in phases that make construction sense.
Why one contractor for everything?+
Coordination. The reason most multi-contractor backyards read 'good but disjointed' is that no single party owns the design intent end-to-end. We do.
Cost, comparisons, and guides
We also deliver complete backyard in
Ready to scope complete backyard for your Arcadia property?
Share your address, scope, and goals — we'll confirm availability, walk the site, and put real numbers on the project.
