What are the best pavers for Arizona heat?
Which paver material actually stays cooler underfoot, resists fade, and survives 20 monsoons? Here's the honest breakdown.
The $199 3D design consultation is credited toward your project when you hire AE.
- AZ ROC 211530 · 347738 · 341002 · 340966
- Arizona-built since 2005
- President, Southwest Hardscapes Association
Travertine (Silver, Ivory, Walnut, Noce)
- Surface temperature: 20–30°F cooler than concrete pavers in same sun.
- Best for: Pool decks, barefoot patios, natural aesthetic.
- Investment: $18–$26 / sq ft installed.
- Care: Reseal every 2–3 years, especially poolside.
Concrete pavers (Belgard, Pavestone, Techo-Bloc, Acker-Stone)
- Best cost-to-durability ratio; huge design flexibility.
- Best for: Driveways, walkways, non-barefoot patios.
- Investment: $14–$20 / sq ft installed; driveways $18–$32.
- Care: Optional seal every 5–7 years; polymeric joint refresh as needed.
Porcelain pavers (large-format)
- Stain-proof, fade-proof, modern look.
- Best for: Contemporary designs, high-end aesthetic, low-care owners.
- Investment: $22–$28 / sq ft installed.
- Care: None beyond sweeping and hose-down.
Common questions.
Match the right paver to your zone
Different zones (pool, driveway, patio) call for different materials. Our designers help you spec each area.
Start My Project PlanWhy this is an investment, not a cost.
An AE backyard is engineered to add daily livability and long-term home value. We publish honest ranges and build to code with a licensed Arizona crew. AE provides project-specific workmanship and manufacturer-warranty information in the signed agreement. Website summaries are for planning only.
- Arizona licensed. ROC 340966 · ROC 341002 · ROC 347738 · ROC 211530. Most Arizona contracting work valued at $1,000 or more — or requiring a permit — must be performed by a properly licensed contractor, subject to statutory exemptions. Verify the legal entity, license status, and classification with the Arizona Registrar of Contractors.
- Real ranges, itemized scope. You see materials, finishes, equipment models, and a line-item budget before you sign — not a one-line "pool — $90,000."
Plan your investment with a designer.
Five minutes, a real range, and no sales pressure. Or vet any Arizona contractor (us included) before you spend a dollar.